NSW battery incentives, explained clearly.
Understand the BESS1–BESS5 activities under the NSW Peak Demand Reduction Scheme, which pathway fits your project, and how Peak Reduction Certificates (PRCs) are created.
The NSW Peak Demand Reduction Scheme (PDRS) provides incentives for eligible activities that reduce electricity demand during peak periods. Qualifying battery energy storage system activities can create Peak Reduction Certificates (PRCs).
The pathway guidance below reflects requirements applying to installations from 7 September 2026 — always refer to the current version of the PDRS Rule.
The right pathway depends on the property type, usable battery capacity, whether a new battery is being installed or enrolled in demand response, the battery/inverter/solar configuration, and the applicable equipment, installation and evidence requirements.
Formbay's subsidiary Beyond Carbon Solutions is currently waiting on IPART to approve its accreditation before allowing onboarding.
Mandatory commencement gate
Every applicable check below must be cleared before work starts.
Onboarding and training: Complete onboarding and training through our ACP, Beyond Carbon Solutions. Upload insurance and complete the training and questions.
Site and system eligibility: Make sure the site and system are eligible under the new activities.
Nomination form: The system owner must sign the nomination form through the Formbay platform before installation starts.
Pre-installation photo evidence: Capture photo evidence of the site in the app before any work starts.
Choose your BESS pathway
Work through the checklist below to confirm which activity your project falls under.
Eligibility checklist
For installations from 7 September 2026Follow your project across the four checks
Ensure your project fits the eligible categories before quoting.
No previous BESS3 claim at site
Class 2 apartment building · 4+ dwellings · supplies common property and/or multiple dwellings
20–200 kWh
No previous BESS4 or BESS5 claims at site
Eligible business site · No data centres
20–200 kWh
No previous BESS4 or BESS5 claims at site
Eligible commercial or industrial site · No data centres
200 kWh–30 MWhOnly the first 10 MWh is claimable
No previous battery installed
Residential building, a small business site, or a government owned and managed site
2–28 kWh
Existing battery joining a VPP
Single dwelling or small business · check registered life support equipment restriction
2–28 kWh
This page is general information only. Always verify current NSW PDRS Rule, IPART and activity-specific requirements before quoting, installing or creating certificates.
BESS guidance & resources
Open a guide to see eligibility, evidence and activity requirements.
PRC eligibility summary General eligibility and definitions for all PRC activities View guide
Key definitions and general rules applying to battery installations across BESS1 to BESS5.
Implementation date
The “implementation date” determines which rules apply to the installation. For a new battery installation (BESS1, BESS3, BESS4, BESS5), the implementation date is the date the system is capable of operating and delivering its intended peak demand reduction. It is typically the date the final required certificate (e.g. CES/CCW) is signed.
BCA classifications
Scheme eligibility often depends on the building classification under the Building Code of Australia (BCA).
- Class 1: Typically a single dwelling (e.g. a detached house or a townhouse separated by a fire-resisting wall). Relevant for BESS1 and BESS2.
- Class 2: A building containing two or more sole-occupancy units where people live (e.g. an apartment building). BESS3 applies to Class 2 buildings containing four or more dwellings.
Usable battery capacity
Under the current PDRS Rule, usable battery capacity for most installations is determined as 90% of the nominal battery capacity (the capacity stated by the manufacturer). BESS5 installations may have capacity determined in a manner specified by the Scheme Administrator.
Minimum customer payment
The scheme requires a mandatory minimum customer payment to ensure the customer is materially contributing to the cost of the system. This must not be reimbursed, waived, or refunded. For BESS3, it is $1,000. For BESS4 and BESS5, it is $5,000.
Accredited Certificate Provider (ACP)
An ACP is an entity accredited by IPART to create PRCs. The system owner must nominate the ACP (such as Formbay's subsidiary) using an approved form before the PRCs can be created. For BESS1, 3, 4 and 5, nomination must occur prior to the implementation date. Installations cannot start until the nomination form is signed.
Evidence requirements for BESS3 Eligible battery installations at Class 2 apartment buildings with four or more dwellings View guide
Updated requirements apply to installations from 7 September 2026.
BESS3 is a dedicated PDRS activity for batteries at Class 2 apartment buildings containing at least four individual dwellings. It is relevant to strata buildings, apartment complexes, owners corporations, embedded-energy projects and shared solar and battery projects.
Capacity and equipment
Combined usable battery capacity must be more than 20 kWh and no more than 200 kWh. Eligible installations must meet applicable equipment, inverter capacity, warranty and network connection requirements. Battery equipment must be on the appropriate Clean Energy Council battery list.
Installation and installer requirements
- There must be no previous BESS3 implementation at the site. A co-located BESS4 or BESS5, or an earlier BESS1 implementation, does not by itself block a BESS3 claim.
- The equipment must supply common-property loads and/or be capable of supplying multiple dwellings.
- The installer must be on the Solar Accreditation Australia installer list.
- The battery must be installed outdoors and in accordance with AS/NZS 5139.
- Applicable planning requirements and required network approvals must be met.
Customer benefit and documentation
A minimum customer payment of $1,000 per implementation is required. The BESS3 customer fact sheet must be supplied with the quotation, and the Accredited Certificate Provider must retain evidence that it was supplied.
Example: A 30-unit apartment complex installs a 100 kWh communal battery. If the equipment, installer, connection and installation conditions are satisfied, this would generally be assessed under BESS3.
Evidence requirements for BESS4 Eligible battery installations at small and medium business sites View guide
Updated requirements apply to installations from 7 September 2026.
BESS4 fills the gap between smaller BESS1 projects and larger BESS5 commercial and industrial projects.
Eligible sites and capacity
The battery must be at an eligible business site, not a residential building or data centre. Typical sites can include retail stores, offices, workshops, restaurants, hospitality venues, smaller warehouses, agricultural businesses and commercial premises.
Combined usable battery capacity must be more than 20 kWh and no more than 200 kWh.
Requirements
- Battery equipment must be on the relevant CEC approved battery list.
- Applicable capacity-to-inverter-output, warranty and network connection conditions must be met.
- The battery must be installed by an installer on the Solar Accreditation Australia installer list.
- The installation must comply with AS/NZS 5139 and applicable electrical, safety, planning and network requirements.
- Required planning, distribution-network and electrical approvals must be obtained where applicable.
- New solar PV capacity of at least one quarter of usable battery capacity is required only when a higher-rate “within 90 days of new solar” equation is used. Standalone battery installations using the lower-rate equations do not require co-installed solar.
A minimum customer payment of $5,000 per implementation is required. The BESS4 fact sheet must be provided with the quotation and evidence of provision retained for compliance and audit purposes.
Example: A manufacturing workshop installs a 120 kWh battery to store daytime solar generation for afternoon use. If the business and battery meet the relevant requirements, this would typically be BESS4.
Evidence requirements for BESS5 Eligible large commercial and industrial battery installations View guide
Updated requirements apply to installations from 7 September 2026.
BESS5 is the PDRS pathway for large-scale behind-the-meter commercial and industrial battery systems.
Sites and capacity
The installation must be at an eligible commercial or industrial business site, not a residential building or data centre. Examples include large warehouses, manufacturing facilities, distribution centres, industrial facilities, large retail centres, commercial property portfolios and high-energy-use businesses.
Combined usable battery capacity must be more than 200 kWh and no more than 30,000 kWh (30 MWh). Although a system may be up to 30 MWh, incentives apply only to the first 10,000 kWh (10 MWh) of eligible capacity.
Technical and project requirements
- Meet specific requirements for battery capacity and inverter output. New solar PV capacity of at least one quarter of usable battery capacity is required only when the higher-rate “within 90 days of new solar” equation is used; standalone batteries using the lower-rate equation do not require co-installed solar.
- Nominal battery capacity must be determined in the manner specified by the Scheme Administrator.
- Be internet-connectable and capable of being controlled by a Demand Response Aggregator.
- Meet the applicable UL9540A thermal-runaway and fire-propagation testing requirements.
- Be installed by an appropriately qualified and licensed person in accordance with applicable legislation and standards.
- Obtain all required DNSP connection, planning, electrical engineering, site safety and battery/fire-safety approvals.
- Timing and evidence (BESS5 Implementation Requirement 2): All planning and network approvals MUST be received before the installation takes place. Evidence includes a Complying Development Certificate (CDC), Development Application (DA) approval, or Distribution Network Service Provider (DNSP) approval.
Example: A large warehouse installs a 1.5 MWh battery with significant rooftop solar to reduce afternoon peak consumption. If technical, connection and scheme requirements are met, it would generally fall under BESS5.
Certificate stacking
Certificate stacking means a project may receive incentives from more than one scheme. Eligibility under one scheme does not automatically permit another certificate from the same installation. Always check the relevant activity rules and whether the schemes reward different benefits.
Common combinations
PV STCs + BSTCs + BESS3/BESS4
Type of install
New solar PV and an eligible battery installed together at a qualifying Class 2 apartment building or eligible business site, with both PV STC and BSTC claims.
PV STCs + BESS3/BESS4
Type of install
New solar PV and an eligible BESS3 apartment-building or BESS4 business battery installed together, without a BSTC claim.
PV STCs + BESS5
Type of install
New solar PV installed with an eligible large commercial or industrial battery under BESS5, without a BSTC or BESS2 claim.
BSTCs + BESS3/BESS4
Type of install
New BSTC-eligible battery installed at a qualifying Class 2 apartment building or eligible business site, without a new solar PV installation.
PV STCs + BSTCs + BESS3/BESS4 + BESS2
Type of install
New solar PV and a BSTC-eligible battery installed at a qualifying apartment building or business site, with eligible BESS2 VPP or demand-response onboarding.
Not currently covered by Formbay
PV STCs + BESS3/BESS4/BESS5 + BESS2
Type of install
New solar PV with an eligible apartment, business, commercial, or industrial battery installation that also includes eligible VPP or demand-response onboarding.
Not currently covered by Formbay
PV STCs + BSTCs + BESS1 + BESS2
Type of install
New solar PV and eligible battery installed together, with the battery also enrolled in an eligible VPP or demand-response arrangement.
Not currently covered by Formbay
PV STCs + BSTCs + BESS1
Type of install
New solar PV and eligible battery installed together at a BESS1-eligible site, without a BESS2 VPP or demand-response onboarding claim.
Not currently covered by Formbay
PV STCs + BSTCs + BESS2
Type of install
New solar PV and eligible battery installed together, with a BESS2 claim for eligible VPP or demand-response onboarding where BESS1 is not being claimed.
Not currently covered by Formbay
PV STCs + BESS1 + BESS2
Type of install
New solar PV and a BESS1-eligible battery installed together, with eligible BESS2 VPP or demand-response onboarding and no BSTC claim.
Not currently covered by Formbay
PV STCs + BESS1
Type of install
New solar PV and a new BESS1-eligible battery installed together, where a BSTC claim is not included.
Not currently covered by Formbay
PV STCs + BESS2
Type of install
New solar PV installation at a site where an eligible battery is enrolled in a VPP or demand-response arrangement under BESS2, without a BSTC claim.
Not currently covered by Formbay
BSTCs + BESS3/BESS4 + BESS2
Type of install
New BSTC-eligible apartment or business battery installation that also includes eligible BESS2 VPP or demand-response onboarding, without new solar PV.
Not currently covered by Formbay
BSTCs + BESS1 + BESS2
Type of install
New eligible battery installation that also joins an eligible VPP or demand-response arrangement, without a new solar PV installation.
Not currently covered by Formbay
BSTCs + BESS1
Type of install
New eligible battery installation at a residential building, small business site, or government-owned and managed site, without a new solar PV installation or BESS2 enrolment.
Not currently covered by Formbay
BSTCs + BESS2
Type of install
New eligible battery installation that joins an eligible VPP or demand-response arrangement under BESS2, without a BESS1 claim or new solar PV installation.
Not currently covered by Formbay
BESS3/BESS4 + BESS2
Type of install
New eligible apartment-building or business battery installation with BESS2 VPP or demand-response onboarding, without PV STC or BSTC claims.
Not currently covered by Formbay
BESS5 + BESS2
Type of install
New eligible large commercial or industrial battery installation with BESS2 VPP or demand-response onboarding, without PV STC or BSTC claims.
Not currently covered by Formbay
BESS1 + BESS2
Type of install
New BESS1-eligible battery installation that also joins an eligible VPP or demand-response arrangement under BESS2, without PV STC or BSTC claims.
Not currently covered by Formbay
No matching combinations
Try clearing some filters to see more results.
Creating PRCs through Formbay
From installation evidence to compliant PRC creation. For eligible PDRS battery activities, Formbay helps manage the installation information, documents and evidence required for compliant PRC creation — from apartment batteries through to large commercial energy storage systems.
- Confirm the activity, building classification and usable capacity before quoting.
- Check product, installer, inverter and warranty eligibility for the specific activity.
- Provide the required customer fact sheet with the quotation and retain evidence.
- Collect nomination, minimum customer payment and installation evidence for certificate creation.
Key dates & availability
The amended BESS3, BESS4 and BESS5 eligibility requirements apply to installations from this date.
Not currently offered through Formbay. Included on this page as general NSW PDRS information only.
Scheme eligibility, regulatory requirements and Formbay service availability can change. Check the current PDRS Rule and activity requirements before acting.