A site may be compatible where:
- The site is located in a supported Australian state.
- The energy retailer supports Intellihub metering services.
- The existing meter needs to be upgraded to a smart meter.
- An existing smart meter is an Intellihub meter.
Activation, site eligibility, job statuses and practical guidance for managing Intellihub metering jobs through Formbay.
Start by activating your account, then check whether the site is eligible before submitting a metering job.
Complete the one-time activation first, then confirm the site is compatible and understand how the metering job will progress in Formbay.
Five steps from Account Settings to activation.
Log in to the Formbay Trading portal. Use the dropdown beside your username and select Account Settings.

Select Metering Partners, open the Intellihub self-activation panel and review the business and contact information shown. Your first name, last name, mobile number and email address can be updated if required.

Tick the checkbox confirming that you authorise Formbay to share your installer details with Intellihub for client self-activation and metering connections.
Read the Intellihub Solar Installer Agreement, scroll through the full agreement and select I Accept.

Once the required information, authorisation and agreement are complete, select Activate for Intellihub to submit your activation.
Before submitting a metering job, check that the site meets the basic Intellihub eligibility requirements.
If any of these circumstances apply, you may need to arrange an alternative metering provider or solution.
The job status shown in Formbay reflects the current stage of your Intellihub meter order. The table below explains what each status means and whether any action is required.
| Job status | What it means | Action required |
|---|---|---|
| Order Received | Intellihub has received your meter order. | No action required unless requested. |
| Does Not Qualify | Intellihub cannot proceed with the meter order. This may be because the property is supplied by a non-participating energy retailer or an existing smart meter is already installed and is not owned by Intellihub. | Arrange an alternative metering solution if required, as this site is not currently eligible for Intellihub metering. |
| Order Cancelled | Intellihub has cancelled the meter order. | This site is no longer eligible for Intellihub metering. If metering is still required, arrange an alternative solution. |
| Retailer Form Prepared | Intellihub has prepared the retailer service order. | No action required unless requested. |
| Retailer Form Submitted | Intellihub has submitted the retailer service order and is awaiting approval. | No action required unless requested. |
| Meter Exchange Scheduled | Intellihub has scheduled the meter exchange. | The installation date has been confirmed. Advise the customer of the scheduled attendance if required. |
| Meter Installed | Intellihub has successfully installed the smart meter. | No action required unless requested. |
| Meter Reconfigured | Intellihub has successfully reconfigured the existing smart meter for solar. | No action required unless requested. |
| Order Completed | Intellihub has completed the metering work and the order is now closed. | No action required. |
| Unable to Complete | Intellihub was unable to complete the scheduled work. | Review the job details and arrange any required follow-up actions before resubmitting or rebooking the work. |
Note: Job statuses and descriptions may change as Intellihub updates its processes.
Use the Refine control in the job list to filter by metering status.

Open the job and use the Metering Job section to see the current metering status and progress.

Small checks at the start can prevent avoidable delays later.
Confirm the customer, retailer and work-order information during the sales process before the application is submitted.
If the customer wants to switch retailers, do it before the metering application starts or after the meter work is complete.
Provide required documents such as switchboard photos and grid-approval evidence as soon as possible.
A quick guide to timing, retailer eligibility, smart meters, switchboards, upgrades and costs.
Allow around three weeks end-to-end as a general guide. Timing can vary depending on the customer’s retailer, whether the correct work order is received and any site issues found during the meter visit.
Most participating retailers are supported. Red Energy is currently handled outside this Formbay pathway, so those jobs need to follow Red Energy’s own process.
If the existing smart meter is owned by Intellihub, the request can be submitted through Formbay. If it belongs to another metering provider, use the normal process for that provider.
Sometimes, depending on the retailer and available lead time. In many cases it is preferable to exchange the meter shortly after the solar installation to avoid possible retailer-related costs.
The switchboard should be ready and compliant before the meter upgrade. Have an appropriately qualified electrician confirm any required work before the metering visit.
The metering process can continue. If the change creates an issue with the planned exchange, Intellihub will advise.
Yes. Eligible upgrade requests can be submitted through the Formbay workflow.
The service is provided without a direct charge to the solar retailer or customer.
These questions help Intellihub understand the site, meter configuration, access and any special requirements before the job is processed.
In South Australia, meter isolators are mandatory to ensure the safety of electrical workers and metering technicians. They provide a dedicated, accessible and lockable point to cut power specifically to the meter. This allows technicians to install, repair or replace meters safely without needing to shut off the entire property’s main power supply.
Who to ask: solar retailer, solar installer or contracted electrician. It’s also useful for solar retailers to ask the customer as part of the sales process.
A smart meter is an advanced, digital device that records electricity or water usage in 5 to 30-minute intervals and automatically sends this data to the energy provider.
Basic meters (analogue or accumulation meters) only measure total overall usage and need to be read manually by a technician. If customers want to install energy-efficiency devices such as solar, you need to ensure they have the appropriate meter inside the switchboard.
Who to ask: solar retailer, solar installer or contracted electrician. It’s also useful for solar retailers to ask the customer as part of the sales process.
Intellihub smart meters will usually have a label on them carrying the “Intellihub” logo. Meters labelled “Acumen” are also owned by Intellihub.
Important: if the customer has an existing smart meter that is not owned by Intellihub, the job is not eligible for processing with Formbay. The solar retailer will need to apply for the meter through the customer’s own energy retailer.
Who to ask: solar retailer, solar installer or contracted electrician. It’s also useful for solar retailers to ask the customer as part of the sales process.
The energy retailer has to approve the meter installation work order. The solar retailer’s customer will provide this information during the sales process.
Important: if the customer switches energy retailers during the meter installation process, the job will be cancelled and completion will be delayed. Switching should be done before the meter application, or after the meter is installed.
Access requirements are important for the smart meter company to be aware of, to ensure the job is successfully completed on the day.
Who to ask: the customer, as part of the sales process.
Access requirements are important for the smart meter company to be aware of, to ensure the job is successfully completed on the day.
Who to ask: the customer, as part of the sales process.
Energy retailers and metering companies want to know this so they can configure the meter correctly, avoid faulty wiring installations, and provide the customer with the cheapest available energy rates.
Who to ask: the customer, as part of the sales process. Otherwise, your solar installer or contracted electrician will have this information.
The site will be single phase, dual phase or three phase. This information is required by the energy retailers when raising the appropriate service order.
Who to ask: your contracted electrician or solar installer. It’s important for solar retailers to ask the customer as part of the sales process.
This covers whether the supply is overhead, underground, or being converted from overhead to underground. It’s required by the energy retailers when raising the appropriate service order.
Who to ask: your contracted electrician or solar installer. It’s important for solar retailers to ask the customer as part of the sales process.
If there is a homeowner with life support at the property, there is a compliance process Intellihub has to follow, which includes obtaining Explicit Informed Consent (EIC) from the customer.
Who to ask: the customer, as part of the sales process.
For a question that is not covered here, or a job that needs a closer look, contact the Intellihub solar-ready metering team.
solarreadymeters@intellihub.com.au
Typical response target: within 48 hours.